Most tracts do not fail on engineering. They fail on sequence: a plat that arrives before the district exists, a drainage assumption that does not survive review, a utility commitment nobody actually secured.

Start a conversation
Aerial view of Lexington Heights: streets of completed single-family homes beside a large area of graded bare lots with roads and kerbs already laid, an older subdivision to one side, forest around, and Lake Conroe on the horizon
Lexington Heights, with the next section graded and streets in ahead of the houses

Who this helps

A developer or landowner holding a tract and deciding whether it works.

When it is useful

Before you commission engineering, and well before preliminary plat.

Scope and deliverables

Feasibility and due diligence
Service availability, drainage, floodplain, groundwater constraints, and what the tract can actually carry.
Entitlement and platting
County development regulations, preliminary and final plat, variances, and the review cycles that eat months.
District strategy and sequencing
Which vehicle, when to start it, and how it interlocks with plat and construction.
Drainage and detention
County drainage criteria, mitigation, and the downstream questions that get asked late.
Phasing
How many lots you can deliver, in what order, against utility capacity rather than against a spreadsheet.
Procurement and owner's representation
Selecting and managing the licensed design and construction professionals, and holding them to the schedule.

Where it gets hard

Current as of 30 August 2026

In Montgomery County, groundwater is the constraint people discover last. Large-volume users have been reducing withdrawal since 2016, and the San Jacinto River Authority's surface water conversion program has been re-evaluated for design basis and cost. A tract that pencils on a groundwater assumption can stop pencilling when the alternative-supply cost lands.

The second one is drainage. County criteria are not negotiable late, and detention that was sized against an optimistic runoff assumption comes back as lost lots. Both of these are cheap questions early and expensive questions after preliminary plat.

Who does what

We scope, procure, coordinate and manage. Engineering design and sealed drawings are performed by registered engineering firms, and we name them on every project. District financial work is performed on the development side. It is not advice to a municipal entity regarding the issuance of municipal securities, and it is not a substitute for a registered municipal advisor, bond counsel or district counsel.

No charge

Talk to us about the land

Acquisition, feasibility, subdivision planning and the infrastructure that makes a tract work. Tell us where the project stands and we will tell you what we would do first.